Resume - Senior Manager Maintenance/Projects


 
(Keywords : Able to integrate into new task. Able to work in a group as well as individually. Persistent, honest & hardworking.)
  
Home   Mechanical Engineering and Manufacturing resumes   Ahmedabad Resumes   Mechanical Manufacturing Jobs

  Candidate Details
Position Sought :
Senior Manager Maintenance/Projects
Age :
52 years     Experience : 3.1
Qualification :
B.E.MechanicalBirla Vishvakarma Mahavidyalaya (BVM) Engineering College, Vallabh Vidyanagar 
Preferred Location :
Ahmedabad, Bharuch, Surat, Vadodara, Vapi
Job Category :
Mechanical Engineering
Expected Salary :
9-10 lacs pa

Resume

SOUND KNOWLEDGE IN MAINTENANCE AND PROJECTS OF CHEMICAL/ FERTILIZER/ PETROCHEMICAL/ PHARMA/ PIGMENT PLANTS PROCESS EQUIPMENTS AND UTILITIES.
EXPERIENCE

Total Experience 31 Yrs.
Sr No Organization Period Post Total Experience
1 Cadila Lab. Ltd., Ankleshwar June80 to Oct84 Maintenance Engineer 4 Yrs.
2 Ficom Organics Ltd., Ankleshwar Oct84 to
March88 Maint. Engineer 3-1/ 2 Yrs.
3 Gujarat State Fertilisers
Co. Ltd., Kosamba March88 to Sept97 Manager (Utility) 9-1/ 2 Yrs.
4 Metro Chem Ind. Ltd., Baroda Oct97 to May03 Manager (Utility) 5-1/ 2 Yrs.
5 Pidilite Ind. Ltd., Vapi June03 to Jan11 Manager (Maintenance) 7-1/ 2 Yrs.
6 Farmson Analgesics (Unit of Farmson Pharma. Guj Pvt. Ltd), Nandesari Feb11 to Cont GM (Maintenance) Contd

JOB RESPONSIBILITY

(A) PROJECT ACTIVITY :

1 Detailed Engineering, Scrutiny of Vendors, Tendering, Tender evaluation, Techno-Commercial discussions and negotiations with Vendors, Issuance of P. O., follow-up, Inspection and testing of equipments at vendors shop, Erection, Commissioning, Operation and Maintenance work.
2 Attending project review meeting.
3 Proper Planning & Scheduling of different project activities,
4 Checking & reviewing of specifications, drawings etc.
5 Co-ordinate the function of Civil, Mechanical, Electrical & Electronics contractors.
6 Testing, commissioning of equipments at guaranteed parameters.

(B) MAINTENANCE ACTIVITY :

1 Ensure running of all machineries and their maintenance.
2 Ensure supply of Furnace Oil, LDO, Natural Gas, Air, Water, Power etc.
3 Organize maintenance of all machinery both preventive and break down in respect to Mechanical, Electrical and Instrument & Electronics.
4 To ensure continuous supply of utilities to get optimum outputs.
5 To control departmental cost by ensuring optimum utilization of engineering inputs.
6 To sign purchase indents for spare parts, follow-up, approve the quality of goods, maintain stocks of all emergency/ critical engineering goods.
7 Energy saving analysis & cost controls.
8 Technical advice to the management regarding power and all engineering matters.
9 To keep all lighting and firefighting equipment intact.
10 To give information to the internal auditors and Insurance Dept. in respect of engineering matters.
11 To develop and organize contractors for fabrication job work.
12 To train officers & staffs.
13 To assist in ISO-9002 procedures & maintaining records.
14 To assist in TPM Activity, JIMP, Japanis concepts.
15 To assist in ISO-14001 & OHSAS-18001 procedures & maintaining records

EQUIPMENTS & UTILITIES :

1 MS/ SS/ Glass lined/ Lead lined/ Rubber lined/ Carbon lined, PP/ FRP Reaction Vessels, Autoclaves, Centrifuges, Heat Exchangers, Pulverizers, Multi Mills, Nauta Dryers, Granulators, Ball Mills, Steam Dryers, Different types of Pumps, Storage Tanks, Vacuum Pumps, Reflux columns, Scrubbers, Filters, Belt Conveyers, Material Handling equipments, Air Blowers, Printing equipments, Formulation equipments, Filter Press, Clarifiers, Blenders, Kneaders, Sand Mills, Dyno Mills, RVD, Ejectors, WRC, Nutsch Filter, Condensers, Micro Pulverizer, Vibro Machine, Dust collectors etc.
2 Compressed Air Systems, Refrigerated Air Dryers, Refrigeration and Air Conditioning Systems, Chilling Plants, Steam Boilers, Thermic Fluid Heaters, Water Treatment System (Soft, DM, RO, Distillation Units), Cooling Towers, Nitrogen and Hydrogen Plant, D. G. Set, E. T. P., Fire Protection System, L. P. G. Vaporization System, Pressurized Air System, Louvers & Ventilation System, De-Humidifier System, E. O. T. Cranes, Elevators, Lifts, Forklift, Stackers, Hyd. Pallets, Road Weigh Bridge, Work-Shop Equipments, VOC Incinerators System, Vapor Absorption Plant etc.  
Top