Resume - Power Plant Operation & Maintenance


 
(Keywords : Operation & maintenance of power plants & boiler)
  
Home   Mechanical Engineering and Manufacturing resumes   Ahmedabad Resumes   Mechanical Manufacturing Jobs

  Candidate Details
Position Sought :
Power Plant Operation & Maintenance
Age :
44 years     Experience : 15.0
Qualification :
B.E.Mechanical (faculty Of Tech.&engg.M.S.University ,VADODARAFACULTY OF TECHNOLOGY & ENGG.M.S.UNIVERSITY, VADODARA 
Boiler proficiency 
Preferred Location :
Gujarat, Ahmedabad
Job Category :
Mechanical Engineering
Expected Salary :
4.5lacks

Resume



Objective : An Exciting and motivating full time position in the field of operation & maintenance of boiler

Exposure :

Anil products limited ( ISO-9000)
(March-2009 to still conti. )
Designation: Dy. manager [Utility]
: Sr. executive utility ( Aug.2005 to sept.2007)
Operation & Maintenance of
C. V. L. make F. B. C. Boiler having 20 T/ hr evp. capacity. Working Pressure 25 Kg/ cm2, Superheated Steam Temp-384 0C
I. J. T. Make Continuous Chain Grate Spreader Stoker Boiler 18 kg/ cm2,32 T/ hr Capacity,340 0C Temp
My sap system & implementation of ISO 9000
Pidilite industries limited vapi( ISO 9001 : 2000, ISO 14001 & ISO 18001 )
Designation Sr. executive (mech)
Operation & maintenance of
Thermax make Gas fired boiler having capacity 8 ton/ hrs. pressure 7 kg/ cm2 temp.170 0C, Thermax make Thermopack boiler, kirloskar make ammonia & air compressor, Nitrogen plant, cooling tower & 1.5mw Cummins DG set, agro waste IBL boiler having capacity 2ton/ hrs.

D. C. W. (DHANGDHRA) From September 2007
Designation : Dy. Manager [Utility]
Operation & Maintenance of
o THERMAX FBC Boiler 60 Kg. / cm2,460 0C,30 T/ hr,3 Nos
o I B L FBC Boiler 35 kg. / cm2, & 400 0C,35 T/ hr
o 3.5 MW BHEL MAKE TG set
o 2.5 MW TRIVENI MAKE TG set
o MAN (GERMANY) MAKE Turbine S/ C
o K/ c make Compressor 3 Nos
with other Utility Equitment
SHREE BHILESHWAR KHAND UDYOG Ltd.,
Designation SR. Engg. [Mech] From Nov- 1994 to Aug -2005
( Narmda sugar feb-2003 to oct.2003 & vadodara sugar oct-2003 to sept.2004
During lay off period on deputation)
Operation & Maintenance of
o N. H. G. C. Make Boiler 35 T/ hr cap.32 Kg/ cm2 & 390 0C Steam Temp
o N. H. G. C. Make Boiler 35 T/ Hr cap 45 Kg/ cm2 & 415+15 0 C Steam Temp
o N. H. G. C. Make Boiler 20 T/ hr cap 21 Kg/ cm2 & 300 0C Steam Temp
o W. I. L. make 32 kg/ cm2 32T/ hr. & 395 0C,21kg/ cm2 310 0C 20T/ hr.
o Thermax make 21kg/ cm2 310 0C 20T/ hr
o All are Bagasse Fired Boilers
o BHEL MAKE 2.5 MW, BELLIS MAKE 3.0MW, ABB MAKE 1.5MW power turbine & bellis make 1.0mw turbine (6 nos)
L. K. PACE INDIA PVT Ltd.
Designation Trainee Engineer [ Q. C. ] From Nov-1993 To Nov -1994
Quality Control of IN Process & Incoming material & finished Goods with I. S. I. & I. S.0.9001 Standards.
Operation & Maintenance:
Preparation of material estimation, work order, Purchase Order, Indenting, material procurement and received material inspection
Detail Engineering of utility equipment with its capability, recording its optimize utilization.
Erection & Commissioning of all types of utility equipment, i. e. Boiler, turbine, DM plant compressor, Esp. etc.
Operation of boiler & power plant with PLC Controller
To Write Specifications, schedules and technical reports and control schedules. Also prepared daily reports of operation of boiler & power plant, monitoring all activity of operations & the same reporting to higher authority.
Involved in the preparation of technical documentation and final summary report.
Having operate preventive maintenance schedule preparation, its implementation for keeping machine run ability, store inventory and control purchase requisition.
Having hands on experience of implementation & operation (i. e. prepare documentation of all activities of utility Equipment) of ISO 9000, ISO 14001 & ISO 18001 systems.

Project Planning :
3.0mw power plant with begasse fired boiler & 1.0mw fibrizer with prime mover turbine errection, commissioning & operation at bileshwar k. s. m. limited. Kodinar dist. amreli gujrat. Also expansion work of mill grinding capacity from 3200 T/ D to 4500 T/ D monitoring.
ESP (three field), Condensate recovery system. Erection, commission & operation at Anil products limited Ahmadabad.
Planning, estimation, tracking, and implementation of project plan within budgets and deadlines
Hands on experience in co-coordinating and implementing pre commissioning and commissioning jobs
Hand on Experience in deployment of available resource to achieve organizational objective
Hand on experience of preparing project documentations.
Profile:
Having high aptitude and on experience for instrumentation and measurement
Good Communication skill coupled with positive and user interaction
Can work in demanding time and schedule
Excellent attitude towards teamwork and common goals.

Computer Proficiency :
Operating Systems : Windows XP & 2000, Windows NT & 98
My Sap
SETU TPM system
SCADA Monitoring & Recording 