Resume - Head Engineering, Electrical Etc


 
(Keywords : Erection, Maintenance)
  
Home   Electrical Engineering resumes   Ahmedabad Resumes   Electrical Engineering Jobs

  Candidate Details
Position Sought :
Head Engineering, Electrical Etc
Age :
47 years     Experience : 22.0
Qualification :
BE (Electrical)Guru Nanak Dev Engineering College, Ludhiana 
Preferred Location :
Baddi, Ahmedabad, Africa, Middle East/Gulf, Kuala Lumpur
Job Category :
Electrical Engineering
Expected Salary :
14-16 Lacs pa

Resume



Objective:
A Challenging position in a dynamic organization with potential for career advancement, where I could utilize my experience and skills for contributing to the growth of the organization
Achievements
Honored with appreciation letter by CEO. for untiring efforts.
Professional Profile
An Electrical Engineer with over 22 years of rich experience in the execution of Projects {BOPET Film Plants (Thick and Thin), Nylon chips plants, Nylon yarn plant, Polyester chips plant, Nylon draw texturising and twisting plant and & common Utilities, Bio fuel based steam turbine, DG sets, Power Distribution, Transformers, HV/ LV Breakers, Power control centers, Motor Control Centers, Power Distribution boards etc } as well as maintenance and troubleshooting (Electrical and Instrument)
Significant experience & expertise in planning & execution of projects for plant set up, plant expansion, business process re engineering, modernization and installation/ commissioning of equipments.
Proficiency in designing maintenance (preventive, predictive & systematic) strategies, procedures and methods; diagnosing breakdown problems; monitoring and controlling maintenance costs.
Proficiency in designing of project schedules, monitoring and controlling the cost within Budget.
Effective communicator with excellent relationship management & negotiation skills to maintain harmonious industrial relations and discipline.
Project Planning & Management
Handling project activities involving working out various requirements with respect to mechanical & utilities, machines, manpower & monitoring overall project operations for ensuring timely completion.
Ensuring that site operations are carried out smoothly & safely with erection, commissioning & procurement operations.
Developing financial projections, preparing budgets and performing extensive project costing.
Managing resources to perform project activities in cost effective manner.
Dealing with consultants/ licensors/ statutory bodies for compliance of requirements.
Maintenance
Planning and effecting preventive maintenance schedules of various machineries and instruments to increase machine up time and equipment reliability.
Pro-actively identify areas of obstruction/ breakdowns and take steps to rectify the equipments through application of trouble shooting tools.
Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O & M expenditures and work within the budget.
Commissioning/ Testing/ Quality
Providing technical inputs and developing master specifications with needs assessment.
Handling erection, commissioning of numerous plants & equipments to ensure the completion of projects within stipulated time/ cost parameters.
Carrying out inspection tests for determining the effectiveness of the equipments/ plants.
Present Responsibilities
Responsible for all activities of electrical and instrument department of complete film plant which includes 5.5meter thick film line,4.7meter thick film line,2nos.8.7meter thin film lines from Dornier Germany,2 nos. Metalizers K5000-2450 and 2 nos. Alox Metalizer K4000-2450 from General Vacuum Equipment, All utility equipments, Duel fuel power plant having 2nos. turbines of 17500KVA each, stand-by 2nos. turbines of 4000KVA each and stand by DG sets. Power Distribution of 11KV and 415Volt etc.
Power system designing for incoming projects.
Planning and effecting preventive maintenance schedules of various machineries and instruments to increase machine up time and equipment reliability.
Procurement of insurance spares within the departmental budget. Maintain the inventory of consumable spares for maintenance.
Pro actively identify areas of obstruction/ breakdowns and take steps to rectify the equipments through application of trouble shooting tools.
Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O & M expenditures and work within the budget
Development and evaluation of the venders.
Preparation of utility costing report per kg of film production.
Responsible for the implementation of ISO 9000-2008 as Dy. Management Representative.
Latest completed Projects
5.5 meter Thick PET Film Line from Dornier Germany which will produce supper clear film having class10000 air conditioning system.
Alox Metalizer from General Vacuum.
Design, Erection and Commissioning of Power distribution system for above project having 3 nos. Distribution transformers, Power Control Center, Power Control Panels, Motor control panels, Distribution Boards, Lighting etc.
Design, Erection and commissioning of Lighting system
Utility like Chilling plant etc.  
Top