Resume - Electrical Engineer

 
(Keywords : Erection steel towers)
  
Home   Electrical Engineering resumes   Chennai Resumes   Electrical Engineering Jobs

  Candidate Details
Position Sought : Electrical Engineer 
Age : 28 years     Experience : 0.5 years  
Qualification : 
B.EJJ College of Engineering and Technology, Tiruchirapalli 
Preferred Location : Chennai 
Job Category : Electrical Engineering
Expected Salary : 30000 
Google

Resume



Objective:

Currently working as Sr Engineer in KEC international Ltd -KOCHINfrom May 2009 to tilldate

N66 Edamon to cochin 400kv quad conductor transmission line

Erection of all types of tower foundation, coordinating with Dept staffs

Reporting Daily completion activities to planning engineer

Witness the site construction activitiesand incoming materials inspection

Maintaining records of calibration, inspection & testing equipments

Name, post held & address: AS Sr. Electrical Engineer Larsen & Toubro Ltd-
UAE on Aug 2007 onwards to Mar 09.
Client : TRANSCO ABUDHABI
Consultant : FITCHNER DUBAI
Main Contractor : L & T ECC. DIVISION. UAE
Project : N3969 FUJIRAH ALDHAID 400KV TRANSMISSION LINE UPTO 60K. M ON STEELTOWER
- - Successfully completed course on Basic firstaid & Fire fighting at GulfTechnical safety traning center Uae
The following Typs of Tower Erection using 50,150 ton Crane & Ginpole Erection (Hilly Area) :
S Tower (0-2); AT Tower (2-30) BAT (30-60),6 Circuit Cantry Tower & Beam Erection :
Study & Understanding of Ground profile drawings, Wire Clearance diagram & Loading Calculations for each steel tower type, Design calculations for each type of tower,
Preparing Tools & Tackles for Stringing, Sagging line & opgw using sag template and sagscope,
The following CONSTRUCTION WORKS guiding to the site supervisor staffs with ensure Quality and safety, Foundation Excavation, Pile Concreting, Pad & Chimney type, Earthing, Tower sorting cross check using
Bill of Maerials, Ground Assembley Torqueing, inspection to consultant, Drum schedule, position the
Tensiner & puller, Clamping, spacer, Jumper fixing, opgw splicing. ODTR testing the opgw, Final
checking, line impedance testing, Testing & commissioning the line
During Line crossing Scaffolding providing & Net protection
Preparation of all required reports, follow up documentation and correspondence of the project.
THE FOLLOWING MANUFACTURING USED
ASCR DOVE CONDUCTOR-MAKE MIDAL-BAGRAIN
TENSIONER & ROLLER, PULLER-MAKE TESMAC
INSULATOR COMPOSITE-TYCO MAKE
HARDWARE FITTINGS & ACCESSORIES-MAKE TYCO
TOWER MATEWRIALS-L & T MAKE
Conductor LINE ENGINEER JOB SPECIFICATIONS:
Positioning of Stringing Equipments:
1. Length of section between Angle point; 2. length of conductor/ wire reels available 3, Preparation of Drum schedule; 4. Tensioner & Puller Positioning
DRUM SCHEDULE:Suitable Drum lenth shall be selected for the section lenth of the line to avoid joints & Conductor wastage
Tensioner & Puller shall be placed on the line app 30-40 M distance towards adjacent section, Miniu 10 m distance has to be maintained between drum & Tensioner
Puller & Tensioner have to be anchored adequately
CONDUCTOR PAVING OUT:
Drum No. and Length verified with drum schedule, The end socs to be connected to pilot wire by a Swell joint. During payout communication is to be Maintained through by Handset Radios
The running conductor shall be escorted by the linemen, reaches the puller stopand apply brake on the tensioner
Pretension & Sagging: Now put the clamp on the conductor to be clamped reachable distance from the pole, Maintain pretension the conductor thro pull lift period I hour at an tnerval of 15 ts using pull lift
Final sagging : This will be carried out as per approved sag & Tension chart check sag level usig sagscope. Note temperature at the time of sagging. After sagging mark the conductor for dead end crimping
JUPMPER INSTALLATION:Conductor ends shall be compressed with jumpercone and then jumper shall be installed, Ensure juper clearance to tower and metal parts as per AFC DWG.
PRECOMISSIONING:Insulation resistance of the line to Earth and between Phases shall be easured with a approved 5KV IR Tester
Line Impedance test shall be conducted and recorded. Verify the measured value with protection relay settings
Following Tools & Tackles for Stringing :
AAAC Comalong Clamp; 3Sheave Areal Roller; OPGW Roller; Hydraulic Compressor & Cutter; Midspan Joint; 3MT,5MT Pull Lifts; Slings; Thermometer; Pilot Wire; Swivel Joint; 5MT Tirfer; 13MM Steel Wire Robe; Tractor; Sagbridge & Sagscope.
S
Expected Salary : 1600US$P. M. free food & Accommodation

Required Joining time: Need a month 
Back To Top