| Resume
Machines Maintenance:-
DORNIER & BRUCKNER, supplied BOPET, BOPP, Film Plant with Bruckner, Barmag, supplied Extruder System.
J-KAMPF winder 6. 5mtr & 8. 7mtr,
Slitting Machines ( ATLAS 6. 5mtr, & J-KAMPF 8. 7mtr, & GALLILIO)
Metalizer ( GALLILIO Vacuum Systems, & VALMET System), CPP (Cast Poly Propylene).
Material Conveying Systems (DHP, Coperian, K-Tron. )
Systems:-
PLC Siemens S5, S-7/ 200, S-7/ 300, S-7/ 400, Allen Bradley,
AC DRIVES Simovert Master Drives VC & MC, Yaskawa Drive, Refu Drives,
Micro Master 420, 430, 440 (Siemens),
DC DRIVES Simoreg 6RA24, DC Master (Siemens 6RA70).
GAUGING SYSTEM Eurotherm Gauging System(EGS), Honeywell Measurex.
COMPUTER MS Windows, MS Office, Installing Hardware & software.
Prepare clone of hard disks of any computer.
SAP system. Net Surfing.
WORK EXPERIENCE
Total Experience: 2 year 3 Months
Since May08 with UFlex Noida as Technical Officer (Electronics & Instrumentation)
A part of FLEX Industries group is the market leaders in the field of manufacturing & marketing of BOPET film with 45000 TPA. AN ISO 9000:2002, ISO 14001:2004, ISO 22000:2005 certified Co.
Notable Accomplishments
Maintenance of High Speed Automatic PLC (S5, Siemens S7/ 300& S7-400) based systems with AC/ DC drives (Siemens), SCADA (WinCC) system, Electropnumetic & Electrohydrolic equipments.
Troubleshooting of Dornier polyester film plant along with Kampf winder, DHP feeding system, Atlas slitter M/ C, Galileo Matalizer &
Planning of shut down & preventive maintenance.
Spare part management & cost consumption monitoring.
Breakdown Analysis, modification of system as required.
Calibration of the instruments as per ISO requirements
From May07 - Apr08 With JINDAL POLY FILMS LIMITED, NASIK as a Shift
Engineer
Jindal poly Films Ltd. Is ISO 9001 certified one of the largest producers of BOPET & BOPP films with annual turnover of Rs. 2000 crores.
Project:- Completed the project of Measurex (Gauging System) upgradation
from MCS System to MX Proline in UFLEX LIMITED Noida.
1. Installed MX PRO Server with proper communication between
mss1, mss2, MX PRO server via Ethernet switch.
2. Made all the cable and work schedule.
3. Installed mss1 & mss2 panel near of Cast & Reel scaneer.
|