| Resume
Project Planning and Execution
Planning, scoping, estimation & implementation of project plans within preset budgets and deadlines.
Coordinating projects for the set up facilities with accountability for strategic utilization & deployment of available resources to achieve organizational objectives.
Preparing budgets & planning funds for diverse operations, ensuring adherence to allotted budgets.
Preparing periodic MIS reports to facilitate decision making by top management
Plant Operations
Overseeing plant operations encompassing material planning & store, R&M and utility budgeting and other allied functions for accomplishment of overall business targets.
Handling plant operations including safe start-up, operation and shutdown of plant, trouble shooting and routine maintenance during shifts.
Developing new process concepts and SOPs for production optimization yield improvement as well as handling quality initiatives etc.
Liaising with Government authorities for obtaining necessary approvals and clearances.
Establishing quality standards, implementing stringent quality control systems to enhance quality and reduce rejection level.
Operations & Maintenance
Planning and effecting preventive/ predictive/ breakdown maintenance schedules of various machineries and equipments in the plant to increase machine up time/ reility. The plant machineries like Svedala, Jaques International, Pegson, Kue Ken, Parker, Telsmith, Simon cone, Shenyang, Nordberg and other crusher machineries, Cummins Generators 1000KVA, 650 KVA and 500KVA
Proactively identify areas of obstruction/ breakdowns and take steps to rectify the equipments through application of trouble shooting tools.
Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial reduction in O&M expenditures and work within the budget.
Installation & Commissioning
Handling installation and commissioning of plants as well as handling facilities for completion of projects in stipulated time/ cost parameters.
Undertaking up gradation, renovation & modification job of the existing machinery, equipment and manufacturing facilities of the plant.
Reviewing plant layout & carrying out inspection tests for determining the effectiveness of the equipments/ plants.
Team Management
Leading, motivating and training the employees to improve their operational efficiency.
Organizing training internal/ external programmes based on the training need analysis to elevate the skills & productivity of employees.
Mentoring and motivating the employees to increase their operational efficiency
EXPERIENCE DETAILS
Good understanding of processes, equipment/ technology, environmental safety and health management. Maintain the HSE policy in the shop floor area
Strategic, yet with ability to go down the line when necessary
strong leadership qualities and strong people management skills
Preparation of electrical design, drawings, reports, specification and cost estimation
Liaise with clients and internal departments to produce electrical system design from concept to detail design and contract administration support
oProject engineering, supervision of Plant, Inventory management, Capacity improvement, Cost reduction and increased efficiency
oTaking care of preventive & breakdown maintenance of electrical machineries & controls.
Oct94 to Nov01 with FT Rock SDN BHD., Malaysia as an Electrical Engineer cum Asst. Plant Manager
Highlights;
Supervising all Electrical system, mobile and fixed plant operations and maintenance
Carry out inspection on major failure and prepare a detailed scope of work and technical specification to effect repairs or improvements.
Planning & implementing maintenance programs for the electrical system and equipment to achieve the targeted reliability of overall electrical system.
Ensuring the Quality work as per British Standards
Involve the design of electrical system in the crushing unit.
Operation in charge of the 3 units
Have vast experience in materials management, cost analysis and operation management in this area.
Due to my initiative of work involvement, the company promoted me from Electrical Engineer to Assistant Plant Manager position with in the short period of time frame.
PREVIOUS ASSIGNMENTS
Feb90 to Jun94 TOKAI KANCO EXPORT CO., LTD., CHENNAI., as MANAGER PRODUCTION
Oct86 to Oct89 SATHYA ELECTRICALS as an Electrical Supervisor, Madras
Aug82 to Dec84 Premier Synthetics (India) Pvt Ltd., Coimbatore, as Junior Engineer.
EDUCATION:
P. G. D. C. A from Glinsys Software, Chennai, India in 2001-2002
M. B. A (Production) from A. M. Jain Institute of Management, Chennai, India in 1989-91
A. M. I. S. E., Associate member in India Society of Engineers 1988
Diploma in Electrical Engineering from Gov
|